MDF BOARD MANUFACTURER
PT. Indonesia Fibreboard Industry – Jambi
- Power Plant 1500KW (18750 KVA)
- Installation trafo 10KV/20V 12.500 KVA "AREVA" = 1 unit
- Installation trafo 400KV/10V 3000 KVA "AREVA" = 1 unit
- Installation trafo 20KV/400V 2500 KVA "AREVA" = 1 unit
- Installation trafo 20KV/400V 2000 KVA "AREVA" = 1 unit
- Installation trafo 20KV/400V 1600 KVA "AREVA" = 5 unit
- Installation trafo 20KV/400V 400 KVA "AREVA" = 4 unit
- Installation trafo 20KV/690V 1000 KVA "AREVA" = 1 unit
- Installation Cubicle SF6 "AREVA" = 40 unit
- Installation Capasitor Bank 11,7 KV
- Installation Capasitor Bank 440V 1200 KVAR
- Installation Capasitor Bank 440V 1440 KVAR
- Installation Capasitor Bank 800V 600 KVAR
- Installation Capasitor Bank 440V 300 KVAR
- Installation Capasitor Bank 440V 180 KVAR
- Installation penangkal petir
- Installation grounding
- Pararel genset 3 x 1000 KVA dengan turbin 18750KVA
TEKSTIL
PT. Tantra Textile Industry - Solo
- 42000 Spindle Ring Spinning Frame (2x2500 KVA Substation) + Capasitor Bank 3500
- KVAR + 3150 KVA Trafo YNYN6 + 1600 KVA LV Panel + 800 KVAR Capasitor Bank +
- MV Cubicle 20KV
PT. Delta Merlin Sandang Textile – Solo/ Sukoharjo
- Electrical Installation 20KV/400V 6x3150KVA + 11000 KVAR Capasitor Bank + LV Panel
- Complete MDP – SDP + Penerangan Utility
PT. Delta Merlin Sandang Textile I
- 4 x 2500 KVA Substation
PT. Delta Dunia Sandang Tekstil – Demak
- Cubicle 20KV + Commisioning
PT. Sinar Pangjaya Mulia – Cimahi
- 2000KVA & 1000 KVA Substation + MV/LV Substation Complete + 2400 KVAR
- Capasitor Bank + Panel SDP + Panel SDP Rajut + Panel SDP Utility
PT. Suritex
- 1000 KVA Substation + Capasitor Bank
PT. Agung Sejahtera Sidoharjatex – Solo
- 3000 KVAR Capasitor Bank 3 Phase 415V/440V
PT. World Yamatex Spinning Mills – Bandung
- 2 x 2000 KVA Substation Complete
PT. Dewa sutratex 2 – Cimahi
- 10.000KVA OLTC Trafo "UNINDO" + 20 KV Cubicle CB Complete
PT. Dewa sutratex 3 – Pekalongan
- 1600 KVA OLTC Trafo "UNINDO"
SUPERMARKET & SWALAYAN
PT. Carrefour – Kuningan Jakarta
- 500 KVAR Capasitor Bank
PT. Subur Makmur Sentosa (Toserba Sabar Subur)
- 630 KVA & 400 KVA Substation + Electrical Engineering Toserba Total (Lighting,
- Ladder, Trafo 630 KVA & 400 KVA, 20KV Cubicle, LV Panel) + 1200 KVAR 3 Phase
- 440V Capasitor Bank
PT. Sarinah Jaya – Jakarta
- 840 KVAR 3 Phase 440V 50Hz Capasitor Bank
MALL
PT. Delta Merlin Dunia Properti – Solo (Hartono Lifestyle Mall)
- 3 X 2500KVA Substation + Cubicle 20KV
HOTEL
Fave Hotel – Solo
- 1000 KVA Substation
FOOD
PT. Aman Food Indonesia – Tangerang
- 1000 KVA Substation Complete
PT. Teh Wangi Dua Burung (Teh Tongtjie) – Tegal
- 630 KVA Substation Complete + Panel LVMDP PLN/Gen 630KVA + Capasitor Bank
- Panel 300KVAR + Panel SDP Compressor
TAMBANG
PT. Refined Bangka Tin – Sungai Liat Bangka Belitung
- 2500 KVA Substation + Trafo + Cubicle + Capasitor
- Genset 3 x 1000 KVA + PLN 2500 KVA Pararel otomatis + 250 KVA
- Genset Interlock Manual dengan genset besar PLN
PT. Nipress Battery – Cileungsi Bogor
- 3 x 2000 KVA Substation + 3600 KVAR Capasitor Bank Complete
- PT. Bukit Timah (Bangka – Pangkal Pinang)
- 1000 KVA Substation
REAL ESTATE DEVELOPERS & CONSTRUCTION
PT. Bumi Abadi Tegar Sakti – Batam
- Electrical Installation 20KV/400V Complete Trafo + Cubicle + Capasitor Pararel
- Genset 1x1000 KVA + 2x500 KVA Pararel dengan PLN
PT. Power Block Indonesia
- 1 x 1000 KVA 20/6KV Substation + MV Capasitor Bank
- 2 x 1000 KVA 20/400V Substation + Capasitor Bank
PT. Power Konstruksi Utama – Serang
- 630KV Substation Complete + Cubicle 20 KV
PT. Mutiara Hitam Tunggal Prakarsa
- 630 KVA Substation + Capasitor Bank 400 KVAR Complete Installation + Capasitor
- Bank Panel 500 KVAR
PLASTIK
PT. Plasindo Lestari – Cikampek
- 2500 KVA Substation Complete Cubicle + Trafo
PT. Cahaya Dinamika Persada – Bogor
- 1600KVA Substation MV/LV + 600 KVAR Capasitor Bank
PT. Bukitmega masabadi – Bandung
- Power and Lighting Installation
PT. Bumi Mulia Indah Lestari – Cikarang
- Electrical Installation 2000 KVA Substation
- Installation Penerangan
- Electrical Installation Injection
PT. Bumi Mulia Indah Lestari Cikande (Proyek Kinocare)
- OLTC 1250 KVA “AREVA” + Capasitor Bank + Reactor + 1 Lot Installasi MV/LV
PT. Bumi Mulia Indah Lestari Merak + Cikarang
- OLTC 2500KVA + SDP + MDP Panel
- Installation Plant I & IV
PT. Kingplast
- 2500 KVA Substation + Capasitor Bank + Reactor + 1 Lot Installation MV/LV
PT. Bumi Mulia Indah Lestari – Bandung (Danone – PT ISAM)
- 1000 KVA Substation + Capasitor Bank 800 KVAR + Reactor + Complete installation
SHOES INDUSTRY
PT. Panarub Industry – Tangerang
- 2500 KVA Substation + Capasitor Bank 1600 KVAR Complete Installation + 1500 KVAR
- Capasitor Bank (Shizuki) + Panel inverter 3 x 55 KW; 1 x 90 KW + PJU Installation
- (Lampu jalan + tiang)
PT. Panarub Dwikarya – Cikupa
- COS Panel + Installation
TISSUE
PT. Asia Pasific Fortuna Sari
- Electrical Installation + Generator Control Panel 2 x 1000 KVA + AMF Panel/ATS
- (Automatic Transfer Swicth) + Panel Penerangan dan Installasi Lampu + Panel ACB +
- MV/LV Substation Complete + Panel Capasitor Bank 1200 KVAR
AUTOMOTIVE
PT. ZX Auto Indonesia – Tangerang
- 1000 KVA Substation Complete + Cubicle 20 KV
PT. Selamat Sempurna Tbk – Tangerang
- 12 x LV Panel + Installation
PT. Selamat sempurna Tbk 3 – Tangerang
- Installation Mufler 1000 KVA Substation
PT. Tokyo Radiator Selamat Sempurna – Tangerang
- 2000 KVA Substation Complete